In this recommended standard any parameter associated

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: rame is fixed for a Mission Phase on a particular Physical Channel. H2.2 TRANSFER FRAME LENGTHS The constraints on Virtual Channel Data Unit (VCDU) (AOS Transfer Frame) lengths specified in reference [E3] were different from those on TM Transfer Frame lengths specified in reference [E2]. In this Recommended Standard, the same constraints are applied to both types of Transfer Frames. H3 TERMINOLOGY CHANGES Tables H-1 and H-2 list the terms that have been changed from references [E2] and [E3], respectively. CCSDS 131.0-B-2 Page H-1 August 2011 CCSDS RECOMMENDED STANDARD FOR TM SYNCHRONIZATION AND CHANNEL CODING Table H-1: Terms That Have Been Changed from Reference [E2] Terms Used in Reference [E2] Telemetry Transfer Frame Terms Used in This Recommended Standard TM Transfer Frame Table H-2: Terms That Have Been Changed from Reference [E3] Terms Used in Reference [E3] Terms Used in This Recommended Standard PCA_PDU Channel Symbols Virtual Channel Data Unit (VCDU) AOS Transfer Frame CCSDS 131.0-B-2 Page H-2 August 2011...
View Full Document

Ask a homework question - tutors are online