PDE6_Water_Resource

Reservoirendpointrequirement

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ft) For any given month i, the following approximate formula holds: Pi 100 H i X i where Pi power generated during month i (kwhr) H i average vertical distance that water falls during month i (ft) hi hi 1 2 , where hi denotes the depth of water at the end of month i X i amount of water discharged through the turbines during month i (Acre‐ft) 6. Reservoir End Point Requirement The amount of water stored in the reservoir at the end of the six‐month period must be within 20% of the amount of water stored at the beginning of the six‐ month period. Design Goals: There are four goals for operation of the reservoir system: 1. Minimize the maximum fluctuation of water stored in the dam over the six‐month period. 2. Maximize the amount of hydroelectric power produced during the six‐month period. 3. Maximize the crop output by minimizing the maximum deviation from the targeted amount of irrigated water supplied each month. 4. Minimize the amount of monthly outflow to the stream that falls outside the desirable limits. Design Exercise: 1. Determine the optimal operation of the reservoir system under each of the goa...
View Full Document

This document was uploaded on 03/11/2014.

Ask a homework question - tutors are online