PDE6_Water_Resource

C

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ls specified. 2. Develop plots of the trade‐offs between the following pairs of objectives for the various operating policies a. Minimizing the maximum fluctuation of water stored in the dam over the six‐ month period vs. minimizing the amount of monthly outflow to the stream that falls outside the desirable limits. b. Minimizing the maximum fluctuation of water stored in the dam over the six‐ month period vs. maximizing the crop output by minimizing the maximum deviation from the targeted amount of irrigated water supplied each month. c. Maximizing the amount of hydroelectric power produced during the six‐month period vs. minimizing the amount of monthly outflow to the stream that falls outside the desirable limits. d. Maximizing the amount of hydroelectric power produced during the six‐month period vs. maximizing the crop output by minimizing the maximum deviation from the targeted amount of irrigated water supplied each month. ________________________________________________________________________ HINT: How to do this. 1. Minimizing the range of storage (and, therefore, the range of water levels) Let St denote the amount of water stored in the reser...
View Full Document

This document was uploaded on 03/11/2014.

Ask a homework question - tutors are online