AUEC2-032 Project Set 3 - UPK5.docx - 1 Outline the...

This preview shows page 1 - 2 out of 5 pages.

1. Outline the implications of not taking account of legislation, regulations, standards and guidelines when producing the engineering project plans
2. Describe how to obtain information on the engineering requirements, and the type of information that is available (such as customer specifications and instructions, quality control requirements, product drawings/specification, manufacturing methods)
3. Identify the products (or assets) involved in the activity being planned, and how to determine their availability

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture