INTERIOR + EXTERIOR ARE DISTINGUISHED BY: STRUCTURAL, ENCLOSURE, MECHANICAL STRUCTURAL SYSTEMS COLUMNS BEAMS LOAD-BEARING WALLS FOUNDATION ENCLOSURE SYSTEMS ROOF FLOOR WALLS MECHANICAL SYSTEMS HEATING/COOLING ELECTRICAL PLUMBING CONVEYANCE Monday, March 18, 13
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
MONOLITHIC VS. LAYERED CONSTRUCTION LIMITED RANGE OF MATERIALS LABOR WAS INTENSIVE SERVED SEVERAL ROLES: STRUCTURAL, FOUNDATION, CLADDING, ETC. MATERIALS BECAME MORE PLENTIFUL DIFFERENT MATERIALS HAVE DIFFERENT ROLES Monday, March 18, 13
Background image of page 4
HOW MATERIALS ARE SELECTED. .. AESTHETIC QUALITIES REGULATORY CONSTRAINTS CONSTRUCTION PRACTICES TECHNICAL PERFORMANCE ENVIRONMENTAL IMPACT ECONOMIC CONSIDERATIONS Monday, March 18, 13
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
CSI + CODES Monday, March 18, 13
Background image of page 6
CSI MASTERFORMAT A LIST OF STANDARDIZED NUMBERS + TITLES FOR ORGANIZING CONSTRUCTION BIDDING + CONTRACT REQUIREMENTS, SPECIFICATIONS, DRAWING NOTES, COST DATA + BUILDING OPERATIONS BY WORK RESULTS DOES NOT ESTABLISH DESIGN DISCIPLINES, TRADE JURISDICTIONS, OR CLASSIFICIATION REVISION IS NECESSARY TO ALLOW FOR NEW MATERIALS + TECHNOLOGIES PROCUREMENT & CONTRACTING SUBGROUP: DIVISION 00 GENERAL REQUIREMENTS SUBGROUP: DIVISION 01 FACILITY CONSTRUCTION SUBGROUP: 02-19 FACILITY SERVICES SUBGROUP: DIVISIONS 20 – 29 SITE & INFRASTRUCTURE SUBGROUP: DIVISIONS 30 – 39 PROCESS EQUIPMENT SUBGROUP: DIVISIONS 40 – 49 CSI ORGANIZES MATERIALS IN THE AEC: Monday, March 18, 13
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
BUIILDING CODES LAWS TO COMPLY WITH HEALTH, SAFETY AND WELFARE OF THE PUBLIC CODE DEVELOPERS MUST KEEP THE ISSUE OF LIFE SAFETY VS. PROPERTY PROTECTION IN MIND ANY PERSON MAY PROPOSE A CODE REVISION, THE COMMITTEE VOTES ON ITS RECOMMENDATION AT AN ANNUAL BUSINESS MEETING AND OFFICIALS WILL VOTE ON THE PROPOSED CHANGES PRESCRIPTIVE (DESIGNERS IDENTIFY THE PROBLEM + LOOK UP PRESCRIBED RESPONSE) + PERFORMATIVE (DEFINE THE PROBLEM + ALLOW THE DESIGNER TO DEVISE THE SOLUTION) UNIFORM BUILDING CODE (UBC) NATIONAL BUILDING CODE (BOCA) SOUTHERN BUILDING CODE (SBCCI) = INTERNATIONAL BUILDING CODE (IBC) Monday, March 18, 13
Background image of page 8
INTERNATIONAL BUILDING CODE (IBC) ESTABLISHED IN 1994 USING INFORMATION FROM THE CURRENT CODES INTERNATIONAL RESIDENTIAL CODE ( IRC ) IS MEANT TO REGULATE CONSTRUCTION OF DETACHED FAMILY DWELLINGS + TOWNHOUSES WITH SEPARATE MEANS OF EGRESS Monday, March 18, 13
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
V V FEDERAL + NATIONAL CODES A LAW BROUGHT BY INDIVIDUALS OR GROUPS ASSERTING VIOLATIONS OF THEIR RIGHTS OF ACCESS, AS CIVIL RIGHTS THE OWNER, NOT ARCHITECT, MUST ADDRESS THIS ISSUE ADA FEDERAL FAIR HOUSING ACT ALL RESIDENTIAL COMPLEXES OF 4+ UNITS MUST BE ADAPTABLE BY A PERSON WITH DISABILITIES FFHA V LIFE SAFETY CODE BY NATIONAL FIRE PROTECTION ASSOCIATION BASIS OF EGRESS CONSIDERED A MAINTENANCE CODE NFPA Monday, March 18, 13
Background image of page 10
INTERPRETING THE CODE AUTHORITY HAVING JURISDICTION (AHJ) PUBLISHES WRITTEN OPINIONS REGARDING INTERPRETATION OF THE CODE
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 12
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 95

242FINAL - 242 FINAL Monday Monday INTERIOR EXTERIOR ARE...

This preview shows document pages 1 - 12. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online