Unformatted text preview: apital) . . . . . . . . . . . . . . Rejected. Chapter 16 Module 7: NPV & IRR If IRR > cost of capital, the project earns a return that is larger than the minimum acceptable return and the NPV > 0 ACCEPT If IRR < cost of capital, the project earns a return that is smaller than the minimum acceptable return and the NPV < 0 REJECT If IRR = cost of capital, the project earns a return that is exactly equal to the minimum acceptable return and the NPV = 0 ACCEPT Chapter 16 Module 7: IRR To calcu...