ACTG2020_Week5 2014 Ch12CMD (1)

Lo 3 utilization of a constrained resource the key is

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ns, the best If there are no other considerations, the best plan would be to produce to meet current plan would be to produce to meet current demand for Product 2 and then use remaining demand for Product 2 and then use remaining capacity to make Product 1. capacity to make Product 1. LO 3 Utilization of a Constrained Resource Let’s see how this plan would work. Alloting Our Constrained Resource (Machine A1) Weekly demand for Product 2 Time required per unit Total time required to make Product 2 × 2,200 units 0.50 min. 1,100 min. LO 3 Utilization of a Constrained Resource Let’s see how this plan would work. Alloting Our Constrained Resource (Machine A1) Weekly demand for Product 2 Time required per unit Total time required to make Product 2 Total time available Time used to make Product 2 Time available for Product 1 × 2,200 units 0.50 min. 1,100 min. 2,400 min. 1,100 min. 1,300 min. LO 3 Utilization of a Constrained Resource Let’s see how this plan would work. Alloting Our Constrain...
View Full Document

Ask a homework question - tutors are online