ACTG2020_Week5 2014 Ch12CMD (1)

O its capacity there is excess capacity on all other

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: y of 2,400 Machine A1 has a capacity of 2,400 minutes per week. minutes per week. Should Ensign focus its efforts on Product 1 or Product 2? LO 3 Quick Check How many units of each product can be processed through Machine A1 in one minute? Product 1 a. b. c. d. 1 unit 1 unit 2 units 2 units Product 2 0.5 unit 2.0 units 1.0 unit 0.5 unit LO 3 Quick Check What generates more profit for the company, using one minute of machine A1 to process Product 1 or using one minute of machine A1 to process Product 2? a. Product 1 b. Product 2 c. They both would generate the same profit. d. Cannot be determined. LO 3 Utilization of a Constrained Resource The key is the contribution margin per unit of the constrained resource. Product 2 should be emphasized. Provides more valuable use of the constrained resource machine A1, yielding a contribution margin of $30 per minute as opposed to $24 for Product 1. LO 3 Utilization of a Constrained Resource The key is the contribution margin per unit of the constrained resource. If there are no other consideratio...
View Full Document

This note was uploaded on 03/28/2014 for the course ACTG 2020 taught by Professor Lizfarrel during the Spring '11 term at York University.

Ask a homework question - tutors are online