3 4 generated by contractor for in house control and

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: nd 2 managed the project manager. 3 4 Generated by contractor for in-house control and managed by the 5 functional manager(s). 6 Planning accuracy is dependent on the WBS level selected. The lower the level the greater is the planning accuracy but the higher the management cost. WBS Tasks WBS Have clearly defined start and end dates Be usable as a communications tool in which results can be compared with expectations Be estimate on a “total” time duration, not when the task must start or end Be structured so that a minimum of project office control and documentation (i.e., forms) is necessary DEVELOPING A WORK BREAKDOWN STRUCTURE (WBS) UTILITY CAR (1.00.00) PROTOTYPE DEVELOPMENT (1.1.0) ADVANCED DEVELOPMENT (1.2.0) PREPRODUCTION QUALIFICATION (1.3.0) FINAL PRODUCTION (1.4.0) WBS Example WBS LEVELS 1.00.00 1.00.00 1 PROGRAM 2 PROJECT 3 TASK 4 SUBTASK 1.1.0 1.1.0 1.2.0 1.2.0 1.3.0 1.3.0 1.4.0 1.4.0 1.2.1 1.2.1 1.2.2 1.2.2 1.2.3 1.2.3 1.2.2.1 1.2.2.1 1.2.2.2 1.2.2.2 1.2.2.3 1.2.2.3 1.2....
View Full Document

This document was uploaded on 03/27/2014.

Ask a homework question - tutors are online