q23814458__000__202.pdf - Question In ( Operations...

This preview shows page 1 out of 1 page.

Question In ( Operations Management ). ( : Question : ) .. ( : Solution : ) .Add a second machine to which all the parts go immediately. For the second machine processing times are independent from the first machine. Gather allthe statistics plus time in the queue, the length of the queue and the second machine utilization.Immediately after this take a constant inspection to carry along and May has a 75% of positive chance. Queue is possible for only single inspector and it isFIFO that means first in first out. All parts exit the system without knowing whether they pass or fail. Similarly make a count of all positive and the fail
End of preview. Want to read the entire page?

Upload your study docs or become a

Course Hero member to access this document

Term
Winter
Professor
Hashem A. Hashem
Tags
Operations Management, Statistics, 75, length of the queue

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture