InClassActivity03-sol

InClassActivity03-sol - Activity #03 SOLUTIONS Last Name...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
6 Activity #03 SOLUTIONS Last Name First Name Student ID Number 3.1 3.2 Total Grader Initials 70 points 30 points 100 points Activity 3.1 (First hour) A. The current machine (codenamed “Jaguar”) has a clock rate of 500MHz, and has the specs on the left Table 1.: The hardware team claims that it can improve the clock rate to 600MHz. The codename for this improved machine is “Jaguar-EH”. A standard practice in the computer industry is to perform extensive simulations of new designs before producing them. For instance, we can run a series of benchmark programs on a simulator for a new processor, and make valuable measurements. Such a study yielded the data shown in the last two columns for Jaguar-EH: Table 1. Jaguar and Jaguar-EH Instruction Class CPI Frequency EH CPI EH Frequency A 2 42% 2 42% B 3 25% 3 25% C 3 20% 3 20% D 5 13% 4 13% a. (10 points) Calculate the CPI and native MIPS ratings for Jaguar. Answer: Average CPI = 2 × 42% + 3 × 25% + 3 × 20% + 5 × 13% = 2.84 cycles / instruction 500 × 10 6 cycles / sec MIPS = = 176.06 × 10 instr / sec = 176 MIPS 2.84 cycles / instr Grading policy: 5 pts each part. 5 pts for correct answer 2 pts partial, 0 pts no answer. b. (10 points) Calculate the CPI and native MIPS ratings for Jaguar-EH. Answer: Average CPI = 2 × 42% + 3 × 25% + 3 × 20% + 4 × 13% = 2.71 cycles / instruction 600 × 10 6 cycles / sec MIPS = = 221.4 × 10 instr / sec = 221 MIPS 2.71 cycles / instr Grading policy: 5 pts each part. 5 pts for correct answer, 2 pts partial, 0 pts no answer. c. (10 points) How much faster is Jaguar-EH compared to Jaguar? Answer: The improvement is the ratio of the MIPs: Average instruction execution time on Jaguar = 2.84 cycles/instruction × 2ns/cycle = 568 ns. Average instruction execution time on EH = 2.71 cycles/instruction × 1.667ns/cycle = 452 ns. Time Jaguar 568 Therefore, performance improvement = = = 1.26 times faster. Time EH 452 Grading Policy: 10 pts for correct answer, 4 pts partial, 0 pts no answer. ECE-562 Computer Organization, Fall 2007
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This homework help was uploaded on 04/08/2008 for the course ECE 562 taught by Professor Zhou during the Fall '07 term at New Hampshire.

Page1 / 4

InClassActivity03-sol - Activity #03 SOLUTIONS Last Name...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online