Midterm1_ME145_S08_solution

Midterm1_ME145_S08_solution - Department of Mechanical...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Department of Mechanical Engineering ME 145 Power Generation Systems - Spring 2008 In-Class Midterm Exam 20 points total Allowed Materials: Tester et al. text and one 8 x 11 sheet. PLEASE WRITE ANSWERS & SHOW WORK ON THESE SHEETS. USE BACK IF NECESSARY BUT YOU SHOULDNT NEED MORE ROOM THAN THAT PROVIDED. ONE OR TWO SENTENCES FOR TEXTUAL ANSWERS. NAME: 1. (2) A certain natural gas fired power plant has a nominal rating of 500 MW(e). Last year (2007), it delivered a net 2.5x10 9 kwhr(e) to the grid. It had a scheduled maintenance outage for the entire month of February and then two unexpected outage of 15 and 10 days, respectively. When the plant was operating, it operated at full power. What was its availability factor and its capacity factor last year? % . . % . 1 57 24 x 365 x 1000 x 500 x10 5 2 x24 365 x Rating Power Produced Energy Factor Capacity 5 85 365 312 24 x 365 x 500 24 x 10) 15 28 (365 x 500 365x24 x Rating Power Available Production Energy ty Availabili 9 = = = = = = = 2. (1) A certain 1 MW(e) wind turbine has a capital cost of $2M. Estimate the capital cost of an evolutionary design that generates 2 MW(e)....
View Full Document

This note was uploaded on 04/09/2008 for the course ME 145 taught by Professor Manno during the Spring '08 term at Tufts.

Page1 / 3

Midterm1_ME145_S08_solution - Department of Mechanical...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online