Solution_Tester_14_2

Solution_Tester_14_2 - reliability – harsh operating...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
2/13/2008 ME 145 - Solution to Tester Text Problem 14.2 Part a ( 29 MW(e) 28 W(e) 10 9 27 2 2 2 170 1025 3 0 2 6 3 2 3 = = = x . x x x . V A P avg c COP π ρ η Part b PROS: higher energy density than wind 40 units 1000 MW(e) no visual pollution predictable current direction renewable, no pollution CONS: complexity, cost of construction (capital cost)
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: reliability – harsh operating environment, fouling, no easy repair local submarine ecosystem impact navigation hazard – very tall, probably > 250m! deployment in open ocean beyond territorial boundaries...
View Full Document

This homework help was uploaded on 04/09/2008 for the course ME 145 taught by Professor Manno during the Spring '08 term at Tufts.

Ask a homework question - tutors are online