d) Based on RCC Design Drawing and Architectural Layout plan, we shall start excavation work with help of Excavators and disposal carried out by engaging sufficient dumpers. e) Individual Footings, Stub Columns, Wall footings, of Main Plant and Non Plant bldg. shall be constructed and Backfilling carried out by earth available at site or brought from outside as per Owner / Consultant advice. f) Rubble Soling and Grade Slab of Bldg. / Structure shall be carried out after duly compacting the back filed earth. SUPER - STRUCTURE: a) Based on Structural / RCC Drawings, Framed structure such as columns, beams, slabs shall be constructed within time schedule with best material and workmanship. b) Centering and form work activity for RCC slab shall be carried out with conventional plywood / steel plates / steel prop - support etc. c) The reinforcement steel laying and concreting activity shall follow after the Shuttering / Formwork is completed. d) We shall Fabricate at site structural steel members and erection carried out as per specification laid out in tender.
Image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 6 e) Terrace Waterproofing of Bldg. shall be carried out after completing terrace slab of All Bldg with 10 years guarantee. f) All above work shall be carried out in presence / guidance of Owner representative / RCC Consultant. g) All safety measures shall be taken during construction activity. BRICK / BLOCK MASONRY : a) The Brick / Block work shall start simultaneously with completion of framed structure and front available floor / area wise. b) The Brick / Block work shall be carried out with best locally available Blocks/bricks as per Programmed. PLASTER [ INTERNAL & EXTERNAL] a) The internal plastering work shall be carried out as per the Bar Chart and curing carried out sufficiently. b) The external plastering work of Brick wall of Building and other structure shall be carried out as soon as internal plaster and fixing of Door / window Base frame is completed. We shall mobilize adequate Manpower / scaffolding material for carrying out this activity. OTHER MISC. STRUCTURE : a) Construction of Other Misc. Structure such as under ground tanks, Drainage, Roads, Paving, Equipment foundations, Equipment Foundations, Pipe racks etc. shall be carried out as per the Drawings issued by consultants and specification laid out in tender / I.S. Code.
Image of page 6
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 7 I) PEAK TIME CONSTRUCTION POWER CONSUMPTION: 440 Volts 3 Phase Connection require at site II) PEAK TIME CONSTRUCTION WATER CONSUMPTION: 80,000 Liters per Day III) PEAK TIME MANPOWER DEPLOYMENT: 1. Unskilled workers : 90 Nos. 2. Carpenters + Helpers : 50 Nos. 3. Reinforcement fitters + Helpers : 20 Nos. 4. Welders, Riggers + Helpers : 02 Nos. 5. Masonry mason + Helpers : 78 Nos. 6. Plaster mason + Helpers : 30 Nos. 7. Electrician & Helper : 03 Nos.
Image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 8
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern