Testing Hardware & structure Cabling As per the project plan, Five Servers will be installed in the server room and the required cabling and racks need to be installed in the switch room. The Hardware engineer along with Network Engineer will be planning the activity and the requirements are as follows No of Data Ports – 30+ 5 No of Voice Ports – 30 ports No of Redundant ports – 30ports Network Design & Implementation
Image of page 4
The Network design activity starts parallel to the structured cabling activity and the implementation would kick off as soon the server room wiring is complete. The Implementation activity would start from the 3rd week of January 2019 and estimated to complete in 5 days. The Network is designed using industry standard Star topology. The New floor requires Voice, Data and Video wiring and electronic facilities to support newest form of telecommunications. The Switch room, which houses the Servers, Networking equipment (Switches, Routers, and Firewalls) connects to the each terminal (Desktop) via Horizontal Cabling. The option for Vertical Cabling can be enabled in future for connecting multiple switch rooms. The list of activities is as follows, Network design Server Installation and mounting Server application configuration Domain and Active directory setup User profiles setup Access privilege creation Software Design & Coding The software developers will be assigned the task of designing the software customized to the requirement. The Design and coding activity is intended to start from mid-3rd week after the servers are configured and installed. The activity is estimated to take 5 days. Two Software developers were appointed for creating bespoke software that is tailored specifically to company’s need as it is a web hosting company the software were used are .net, Java, PHP and C++.The software developers are skilled on various programming languages and are proficient in design and development of the bug free software. The list of activities for the software developers’ team is as follows, Software design Software coding Software compiling Software Release Testing One hardware testing engineer and software testing engineer were appointed their responsibilities is to setup of test processes including hardware and software deployment, provide technical support
Image of page 5
and training when required advanced testing, performing complex diagnostic tests on faulty computer. Software testing technician execute test plans to evaluate the performance of software applications and information and telecommunication systems. The Testing will be done by 2 Engineers, one will be conducting Software Testing and the other will be conducting Hardware Testing. The activity will be handled by each individual post Hardware and Software implementations. The Software Testing activity will include, Code review Design Review Test Plan Manual & Automation Testing Code tweaking and Regression Hardware Testing Activity will include System Definition System Testing Fault Testing Load Testing
Image of page 6
Image of page 7

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture