Course Hero Logo

You are now required to prepare a draft request for

Course Hero uses AI to attempt to automatically extract content from documents to surface to you and others so you can study better, e.g., in search results, to enrich docs, and more. This preview shows page 7 - 10 out of 32 pages.

You are now required to prepare a draft request for proposal (RFPs) which you must present to your Project Manager forapproval to send to a few suppliers. In order to prepare the proposal, you must research different types of label printers.(1 to 2 A4 pages).
BSBPMG416 Assessment TasksVersion 25 October 2017Page 7 of 32
ASSESSMENT TASKSQualificationBSB41515 Certificate IV in Project ManagementCluster number and name:PMC4 4.2 Apply project management risk techniquesUnits of competency:BSBPMG416 Apply project procurement procedureStudent’s ID:437431 Ingrid CastellanosAssessor’s name:Dean EganNumber of weeksWeeks 5-9The C7500 model works on demand with exceptional quality and speed of printing. This industrial printer helpsmanufacturers meet their labeling needs in their own facilities, including labels for food and beverage products, packagingand boxes. This model is easy to use and requires practically no maintenance. The included LCD control panel makes it easyand quick to configure the printer, while ESC / Label, the new command for all label printers, allows printer integration inalmost any operating system.I would appreciate if you please send us the budget of the product that was chosen, including all the necessarydocumentation. (Attached image of the selected product)Thanks for your help and attention, we will be attentive to a prompt response.BSBPMG416 Assessment TasksVersion 25 October 2017Page 8 of 32
ASSESSMENT TASKSQualificationBSB41515 Certificate IV in Project ManagementCluster number and name:PMC4 4.2 Apply project management risk techniquesUnits of competency:BSBPMG416 Apply project procurement procedureStudent’s ID:437431 Ingrid CastellanosAssessor’s name:Dean EganNumber of weeksWeeks 5-9REQUEST FOR PROPOSAL (RFPs)TABLE OF CONTENTSINTRODUCTIONThe manufacturing company of Smith is a very large company that produce food products. These products are packedin boxes and labeled appropriately. The company operates 24 hours a dayThe company's Board of Directors has decided that they would like to replace all the label printers and get the latest

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 32 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Fall
Professor
N/A
Tags
Project Management, Credit card, Dean Egan, INGRID CASTELLANOS

Newly uploaded documents

Show More

Newly uploaded documents

Show More

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture