8 that the requirements of the construction permit

This preview shows page 30 - 33 out of 33 pages.

CFR § 70.8; that the requirements of the construction permit will be incorporated into the Title V permit through the administrative amendment process; that the public will not receive another opportunity to provide comments when the requirements are incorporated into the Title V permit; and that EPA review, EPA objection, and petitions to EPA will not be available to the public when requirements from the construction permit are incorporated into the Title V permit. (2) A copy of the construction permit application is sent to EPA, as provided by 40 CFR § 70.8(a)(1). (3) A copy of the draft construction permit is sent to any affected State, as provided by 40 CFR § 70.8(b). (4) A copy of the proposed construction permit is sent to EPA for a 45-day review period as provided by 40 CFR § 70.8(a) and (c).
Image of page 30

Subscribe to view the full document.

TITLE V STANDARD CONDITIONS October 15, 2003 (5) The DEQ complies with 40 CFR § 70.8 (c) upon the written receipt within the 45- day comment period of any EPA objection to the construction permit. The DEQ shall not issue the permit until EPA’s objections are resolved to the satisfaction of EPA. (6) The DEQ complies with 40 CFR § 70.8 (d). (7) A copy of the final construction permit is sent to EPA as provided by 40 CFR § 70.8 (a). (8) The DEQ shall not issue the proposed construction permit until any affected State and EPA have had an opportunity to review the proposed permit, as provided by these permit conditions. (9) Any requirements of the construction permit may be reopened for cause after incorporation into the Title V permit by the administrative amendment process, by DEQ as provided in OAC 252:100-8-7.3 (a), (b), and (c), and by EPA as provided in 40 CFR § 70.7 (f) and (g). (10) The DEQ shall not issue the administrative permit amendment if performance tests fail to demonstrate that the source is operating in substantial compliance with all permit requirements. B. To the extent that these conditions are not followed, the Title V permit must go through the Title V review process. SECTION XXII. CREDIBLE EVIDENCE For the purpose of submitting compliance certifications or establishing whether or not a person has violated or is in violation of any provision of the Oklahoma implementation plan, nothing shall preclude the use, including the exclusive use, of any credible evidence or information, relevant to whether a source would have been in compliance with applicable requirements if the appropriate performance or compliance test or procedure had been performed. [OAC 252:100-43-6]
Image of page 31
PART 70 PERMIT AIR QUALITY DIVISION STATE OF OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY 707 N. ROBINSON STREET, SUITE 4100 P.O. BOX 1677 OKLAHOMA CITY, OKLAHOMA 73101-1677 Issuance Date: Permit Number: 2004-226-C (PSD) Nomaco, Incorporated , having complied with the requirements of the law, is hereby granted permission to construct a polyethylene foam extrusion plant in Sec. 35 – T12N – R 5W, on Reno Avenue between Sara Road and Morgan Road, Oklahoma City, Canadian County subject to the following conditions, attached: [X] Standard Conditions dated October 15, 2003 [X] Specific Conditions
Image of page 32

Subscribe to view the full document.

Image of page 33
  • Spring '13
  • L
  • National Ambient Air Quality Standards

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern