Given a draft capability development document cdd and

This preview shows page 8 - 11 out of 11 pages.

[Given a draft Capability Development Document (CDD) and a summary Analysis of Alternatives (AoA), select an appropriate concept, from the perspective of the system developer, to meet the user's requirements.]Alternative 1Alternative 2
1) An Analysis of Alternatives (AoA) is a study of the __________. [Given an Initial Capabilities Document (ICD) and a summary Analysis of Alternatives (AoA), select an appropriate concept, from the perspective of the system developer, to meet the user's requirements.]
1) A software costing method that uses a team of experts working both independently and together to combine different approaches and arrive ata collective judgment through consensus is an example of the _________ costing method. [Select an appropriate approach (e.g., Analogy, Parametric, Top-Down, Engineering (Bottom Up, Actual, Delphi) to estimate the cost and schedule for a software-intensive system.]
downBottom-upParametric2) An Analysis of Alternatives (AoA) is a study of the __________. [Given an Initial Capabilities Document (ICD) and a summary Analysis of Alternatives (AoA), select an appropriate concept, from the perspective of the system developer, to meet the user's requirements.]
3) As a general rule of thumb, __________ of the total ownership costs of a system occur late in the life cycle, due to costs associated with operations and support. [Recognize the impact and interrelationship of life cycle product support and life cycle cost.]70-80%50-60%90-95%30-40%
4) The _______________ and the _____________________ along with the Funding Plan should be established early on in the Joint Capabilities Technology Demonstration (JCTD) to ensure that preparations are developed to facilitatemovement of the JCTD into the acquisition process. Please choose from below to fill in the blanks. [Determine the applicability of science and technology activities to the acquisition of a system.]
5) The largest percentage of software life cycle costs is associated with _________? [Relate the typical distribution of software life cycle costs to the planning of an acquisition program.]
6) Total ownership cost, which includes the costs associated with research, development, test and evaluation, procurement, military construction, military personnel, operations and maintenance, and disposal of a system, isalso known as: