power off due to a power supply failure. What is the best recovery procedure?
A. Restore full system backup from tape.
B. Use LAN Disk Rebuild Utility
C. Rebuild subordinate controller from scratch
D. Use the Loop Backup Feature (LBF)
E. Replace power supply and reboot.
Answer:
E
QUESTION
151
A retailer wants to measure the current system processor utilization performance
collected through the Performance Monitor to compare against future performance.
Which of the following can significantly skew the processor utilization
measurements?
A. Peak hours
B. Hourly crossings
C. Auxiliary console activity
D. Report printing
E. Store close
Answer:
D
QUESTION
152
What is the major difference between a 4610-T13 and a 4610-T14?
A. Print speed
B. Logo and barcode printing capability
C. MICRO and check-flipping capability
D. 4610-T13 connects via RS-485, while T14 connect via USB.
Answer:
C
QUESTION
153
43

To allow the 4690 controller to access other systems via telnet, which of the
following steps is necessary?
A. Configure VT100 emulation using system configuration
B. Define the enhanced telnet client in the INETD data file.
C. Add multiple auxiliary consoles in system configuration
D. Start the telnet client on the controller by invoking ADXHSIVL or VT100.
E. Start the serial connection with the VT100 parameter
Answer:
D
44

For More exams visit http
s
://killexams.com
/vendors-exam-list
Kill your exam at First Attempt
....
Guaranteed!

You've reached the end of your free preview.
Want to read all 6 pages?
- Fall '20