For the mass diagram shown below a calculate the

This preview shows page 2 - 5 out of 6 pages.

Question # 2 For the mass diagram shown below:A) Calculate the total volume of cut, fill, waste and borrowB) The average length of haul for section 1504035003000302010-200-10-30-40-50-60500010001500200025004000450050005500123ftX103 CY
GOOD LUCKA. Determine the expected dragline production in BCY per hour for the followingdragline operation: (12 points)
B. Describe the impact of altitude on the performance of construction equipment(3 points)
GOOD LUCK
D. Estimate the production in loose cubic yards per hour for a medium-weightclamshell excavating loose earth. Average bucket load is 0.75 cu yd. The soilis common earth with a bucket fill factor of 0.95. Estimated cycle time is 40 s.Job efficiency is estimated at 50 min/h. (12 points)B.C.Define drawbar-pull and rim-pull. (2 points)D.Determine average hourly production of 9-S crawler dozer with a straight

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture