Lot I: Stringing of the second circuit of the 230 kV Alamata– Combolcha II-Legetafo transmission line. Lot II: Installation of the 230 kV line bays at Combolcha II and Legetafo substations. Closing date: March 7, 2016 Contact: Kefyalew Mergiya, Around Commerce School, Behind Awash International Bank Head Quarter, Addis Ababa, Ethiopia Phone: +251 11 5580781 Fax: + 251 11 5546844 Email: [email protected] Construction of 765 and 400 kV lines Country: South Africa Organisation: Eskom Holdings SOC Limited (Eskom) Description/Scope of work: International competitive bids are invited for the construction of the 765 kV and 400 kV Masa– Ngwedi (Section D and E) transmission lines under the World Bank funded-Eskom Investment Support Project. The scope of contract involves providing access to roads and infrastructure; bush clearing; supply of tower foundations and stay wire foundations; fabrication and erection of structural steel transmission towers; installation of hardware, conductors and insulators; tower assembly, stringing and labeling; conductor regulation; and supply of a fall arrest system (FAS). Closing date: February 12, 2016 Contact: Wimpie White, Eskom, Tender Issue Office, Main Reception, Ground Floor, Megawatt Park, Maxwell Drive, Sunninghill, Johannesburg, South Africa Phone: +27 11 8005979 Email: [email protected] Website: Construction of 400/220 kV substations Country: Tanzania Organisation: Tanzania Electric Supply Company Limited (TANESCO) Description/Scope of work: International competitive bids are invited for the plant design, supply, construction, installation and commissioning of 400/220 kV substations under the African Development Fund (ADF), JICA and European Investment Bank (EIB) funded-Iringa–Shinyanga Backbone Transmission Investment Project (BITP) in two lots. Lot I: Construction of 400/220 kV substations at Iringa and Shinyanga. Lot II: Construction of 400/220 kV substations at Dodoma and Singida. Closing date: January 18, 2016 Contact: Khalid R. James, Project Manager, TANESCO, Head Office, Umeme Park Building, Ubungo-Morogoro Road Ground Floor, Twiga Board Room, Dar es Salaam, Tanzania Phone: +255 736501649 Email: [email protected] Website: Consultancy services for the 220 kV line Country: Uganda Organisation: Tanzania Electric Supply Company Limited (TANESCO) Description/Scope of work: International competitive bids are invited to provide consultancy services for the review and update of feasibility study of the 220 kV Masaka–Mwanza Transmission Line Project funded by the KfW Development Bank. Closing date: February 12, 2016 Contact: The Secretary, TANESCO, TANESCO Tender Board, TANESCO Head Office, Umeme Park Building, Morogoro Road, Ubungo Ground Floor, Room No. G15, P.O Box 9024, Dar es Salaam, Tanzania Email: [email protected]
Image of page 61
The mission of Global Transmission is simple and modest – to provide you with comprehensive and up-to-date information and analysis on the global electricity transmission industry.
Image of page 62

You've reached the end of your free preview.

Want to read all 62 pages?

  • Fall '10
  • BOB
  • Electric power transmission, Electricity distribution, Electricity market, CFE, Federal Energy Regulatory Commission

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes