Another service that can be outsourced in this project is the proposal this is

Another service that can be outsourced in this

This preview shows page 3 - 6 out of 15 pages.

Another service that can be outsourced in this project is the proposal; this is a document that will help in the invitation of the suppliers. The document is usually presented in the early stages of the procurement process, mainly through the bidding process. The main aim of this document will be to alert the suppliers to submit proposals or even commodities and services. Request for information
Image of page 3

Subscribe to view the full document.

PROJECT MANAGEMENT AND COMMUNICATION 4 The interstate association of Washington and Oregon seeks information on the prevailing prices of construction materials following the proposed interstate bridge project. The association seeks the prices that will give the anticipated results; hence, the vendors should be ready to prove so. The vendors should also meet all the constitutional requirements 3 . Determining the Criteria to Use in Selecting Sellers for the Contract Some of the factors that should be considered in the selection of suppliers include; On-time performance; the supplier must utilize the variability time to ensure that he delivers within the promised time. The supplier must be able to provide the products on time to avoid unnecessary delays that may end up delaying the whole project. Also, supplier variability is substantial. It states the likelihood that the supplier will be in the area of an agreement to deliver what he/she promises. This factor is vital since it provides an excellent measure to deal with a supplier who supplier unreplaceable products. it is crucial to consider the supply quality of the suppliers. The continuous supply of inferior quality products increases the variability of the supplied items. Because the products are meant for the construction of a durable bridge, the products should bear the best quality. Inbound transportation costs is also an essential factor to consider. This is one of the factors that may affect the replenishment lead time. The transportation costs will depict how fast the supply materials will reach the preferred destination. Supply flexibility is also another critical factor in accessing potential suppliers. It depicts the variation that may occur in the ordered quantity. The supplier must be able to tolerate this variation without affecting other performance factors of the project. The measure is essential since it depicts the success rate of the supply process.
Image of page 4
PROJECT MANAGEMENT AND COMMUNICATION 5 Various factors affect the process of selecting the right design-build contractor. For instance, the contractor should minimize the duration of completing the set task. That is, the contractor should use the least time to complete the overall project compared to delivery methods in other projects. Secondly, the contractor should aim at reducing the cost. The cost reduction criterion is always in comparison with other projects. The contractor should also establish the expected price. This move helps in stimulating funding for the project.
Image of page 5

Subscribe to view the full document.

Image of page 6
  • Fall '18
  • DR.KANGANGI

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Ask Expert Tutors You can ask You can ask ( soon) You can ask (will expire )
Answers in as fast as 15 minutes