Correct 100 points out of 100 Question 8 Correct 100 points out of 100 Of the

Correct 100 points out of 100 question 8 correct 100

This preview shows page 4 - 5 out of 16 pages.

Question 7 Correct 1.00 points out of 1.00 Question Correct 8 1.00 points out of 1.00 Of the following, which is not an acceptable method of project creation? Select one:a. The project manager creates the project charter and has someone with theappropriate authority sign itb. The sponsor creates the project charter and signs itc. A project charter is taken from a similar project and reusedd. Senior management creates the project charter and signs itUsing a project charter from a previous project does not create a new project, since everyproject is unique. If that charter were appropriately modified and re-authorized, that couldwork, but that is not included in the answer. To create a project, the project charter must becreated by anyone authorized to do so, even the project manager, but it must be signed bysomeone who can provide the project manager with the authority to manage the project,typically the sponsor or senior management. [Crosswind Manual 4.6; PMBOK® Guide4.1.1.1]The correct answer is: A project charter is taken from a similar project and reused Project management roles not only describe project participation levels of various personnel,they also indicate responsibility. Which of the following is the most accurate in terms of itsdescription? Integration Practice Exam (30 Questions)
Image of page 4
Image of page 5

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture