shall respond to any inspection results that require corrective actions to assure the continued safe operation of piping. API 570 was developed for the petroleum refining and chemical process industries but may be used, where practical, for any piping system. It is intended for use by organizations that maintain or have access to an authorized inspection agency, a repair organization, and technically qualified piping engineers, inspectors, and examiners. An employee / personnel of an authorized inspection agency who is requested to be qualified and certified to perform the functions specified in API 570. An NDE examiner is not required to be an authorized piping inspector. Whenever the inspector is used in API 570, it refers to an authorized piping inspector. 3.3. ACTUAL STATUS ANALYSIS FOR INSPECTOR POSITION Industry Inspector all have a good knowledge & experience in Non-Destructive-Testing (NDT). However, not ALL inspectors are currently qualified of NDT properly (mean not be officially trained & certified). In fact, there are still 02 inspectors not to spend the training, examination and certification for Non-Destructive-Testing (NDT). Based on the analysis, this actual status will bring up with the possible consequences as below: Inspector not properly qualified of NDT Not meet the project’s requirement Not satisfy the client’s needs in some cases Become the Non- conformity in audit ISO 17020 Become less competitive in business for long-term
Image of page 16
Human Resource Management Assignment P a g e | 16 4. TRAINING PLAN & PROGRAM The Training plan / program is proposed for the Inspector position, be defined as followings: Based on the training plan, the 2 inspectors shall be sent out for NDT training (external training). Currently Vietnam NDE Institute is the one who take care the NDT training courses throughout Viet Nam. CONTENT No Courses Training type Cost / man Number of training days (Internal / External) (USD) 1 RT - Radiographic Testing Level II External 500 4 2 MT - Magnetic Testing Level II External 500 4 3 UT - Ultrasonic Testing Level II External 600 4 4 PT - Penetrant Testing Level II External 500 4 Total 2,100 SCHEDULE CONTENT 15-Feb 15-Mar No Courses Week 01 Week 02 Week 03 Week 04 Week 05 Week 06 Week 07 Week 08 1 RT - Radiographic Testing Level II 2 MT - Magnetic Testing Level II 3 UT - Ultrasonic Testing Level II 4 PT - Penetrant Testing Level II
Image of page 17
Human Resource Management Assignment P a g e | 17 5. EXPECTATION AFTER TRAINING COURSE While the inspector are familiar to NDT inspection, they are expected to get certificate officially. With background of inspection experience and engineering education of university, furthermore, the inspector would apply what they learned from training course into the tasks. Expectation from training Awareness & Successful application Pass examination & get NDT certification
Image of page 18
Human Resource Management Assignment P a g e | 18 6. PERFORMANCE MONITORING – SUPERVISION PLAN After the training, the inspector’s performance shall be monitored for 5 related jobs consecutively by Technical Manager and be recorded accordingly. Moreover, by annually the inspector are supervised and monitored throughout the working time. Their performance, skills, the process to conduct the job shall be evaluated and recorded. If any improvement proposed for the inspector, another performance monitoring – supervision plan / schedule will be specified after then.
Image of page 19
Image of page 20

You've reached the end of your free preview.

Want to read all 22 pages?

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture