4x 2y 4 2 1400 14 x 3y 1 3 450 1 4x 2y 4 2 1400 corner pts as computed by

4x 2y 4 2 1400 14 x 3y 1 3 450 1 4x 2y 4 2 1400

This preview shows page 9 - 23 out of 41 pages.

4x-2y 4 -2 14.00 <= 14 x-3y 1 -3 -4.50 <= 1 4x-2y 4 -2 14.00 >= 0 corner pts as computed by (1.429,2.857) (4.333,3.583) (5.1,3.2) (4,1) (1,0) (0,0)
Image of page 9
Image of page 10
Image of page 11
Microsoft Excel 15.20 Answer Report Worksheet: [HW Chapt7.xlsx]C7 HW4 Report Created: 4/1/2016 11:36:28 AM Result: Solver found a solution. All constraints and optimality conditions are satisfied. Solver Engine Engine: Simplex LP Solution Time: 0.330771 Seconds. Iterations: 4 Subproblems: 0 Solver Options Max Time Unlimited, Iterations Unlimited, Precision 1E-06, Use Automatic Scaling Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume Objective Cell (Max) Cell Name Original Value Final Value $D$5 Z Max Z 0.00 419.50 Variable Cells Cell Name Original Value Final Value Integer $B$4 Solution x1 0.00 5.10 Contin $C$4 Solution x2 0.00 3.20 Contin Constraints Cell Name Cell Value Formula Status Slack $D$12 4x-2y LHS 14.00 $D$12>=$F$12 Not Binding 14.00 $D$8 2x+4y LHS 23.00 $D$8<=$F$8 Binding 0 $D$9 -x+4y LHS 7.70 $D$9<=$F$9 Not Binding 2.3 $D$10 4x-2y LHS 14.00 $D$10<=$F$10 Binding 0 $D$11 x-3y LHS -4.50 $D$11<=$F$11 Not Binding 5.5
Image of page 12
e NonNegative
Image of page 13
HW5 from handout Varible x1 x2 Solution 18.75 18.75 Max Z Z 4 4 150.00 st LHS RHS 3x+5y 3 5 150.00 <= 150 x-2y 1 -2 -18.75 <= 10 5x+3y 5 3 150.00 <= 150 corner pts as computed by (0,0) 10,0) (25.385,7.692) (18.75, 18.75) (0,30) Below info can be found on Answer portion Slack Varibles are 3 and no surplus varibles s1 = 0 s2 = 28.75 s3 = 0 Binding Varibles are 3x+5y and 5x +3y Non Binding Varible is x-2y
Image of page 14
Image of page 15
Image of page 16
Microsoft Excel 15.20 Answer Report Worksheet: [HW Chapt7.xlsx]C7 HW5 Report Created: 4/1/2016 12:31:19 PM Result: Solver found a solution. All constraints and optimality conditions are satisfied. Solver Engine Engine: Simplex LP Solution Time: 0.304872 Seconds. Iterations: 3 Subproblems: 0 Solver Options Max Time Unlimited, Iterations Unlimited, Precision 1E-06, Use Automatic Scaling Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume Objective Cell (Max) Cell Name Original Value Final Value $D$5 Z Max Z 0.00 150.00 Variable Cells Cell Name Original Value Final Value Integer $B$4 Solution x1 0.00 18.75 Contin $C$4 Solution x2 0.00 18.75 Contin Constraints Cell Name Cell Value Formula Status Slack $D$8 3x+5y LHS 150.00 $D$8<=$F$8 Binding 0 $D$9 x-2y LHS -18.75 $D$9<=$F$9 Not Binding 28.75 $D$10 5x+3y LHS 150.00 $D$10<=$F$10 Binding 0
Image of page 17
NonNegative
Image of page 18
7-23 (pg282) Varible x1 x2 Solution Max Z Z 2 0.00 st LHS RHS x+3y 1 3 0.00 >= 90 8x+2y 8 2 0.00 >= 160 3x+2y 3 2 0.00 >= 120 y 1 0.00 <= 70 corner pts as computed by (0,70) (2.5,70) (0,60) (8,48)
Image of page 19
Image of page 20
Image of page 21
7-33 (pg282) Varible x1 x2 Solution 30.00 60.00 Max Z Z 5 6 510.00 st LHS RHS 2x+y 2 1 120.00 <= 120 2x+3y 2 3 240.00 <= 240 corner pts as computed by
Image of page 22
Image of page 23

You've reached the end of your free preview.

Want to read all 41 pages?

  • Fall '15
  • LHS, Max Z

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture