size is not likely to be implemented by a project manager, but more likely by the seniormanagement or sponsor. [Crosswind Manual 13.1.2; No PMBOK® Guide Reference]The correct answer is: Meet with the team to determine the impact
Image of page 13
/ Question 21CorrectThe retail ERP project is the largest the company has done in its history. There are anumber of pieces of work the team has decomposed via a breakdown structure to bettercontrol the project. Of the following breakdown structures and descriptions, which iscorrect? 1.00 points out of 1.00
Image of page 14
/ Question 22CorrectThe validate scope process has been started at the end of phase 3 of the project. Themain deliverable was sent to the customer. Three weeks have passed and the customeracts as if the deliverable was never received. Which of the following is the best action totake? 1.00 points out of 1.00
Image of page 15
/
Image of page 16
Image of page 17

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture