Final software product by a development project with

  • No School
  • AA 1
  • 4

This preview shows page 3 - 4 out of 4 pages.

final software product by a development project with respect to the user needs and requirements Demonstration of consistency, completeness, and correctness of the software at each stage and between each stage of the development life cycle. Test Effectiveness Test efficiency Test Effectiveness = Loss due to problems / Total resources processed by the system Test efficiency= (number of tests required / the number of system errors)
Image of page 3
CSTE Mock Test - Part IV – Questions Along with Answers Page 4 of 4 "Effective", means producing, or capable of producing, an intended result, or having a striking effect. For example, "For rapid long-distance transportation, the jet engine is more effective than a witch's broomstick". “Efficient" means having a high ratio of output to input; working or producing with a minimum of waste. For example, "An efficient engine saves gas". 10. “X” wants to develop online trading system in 2 months with no increase in team size. Online transactions has to be complete within 2 seconds and online search should not take more than 5 seconds. How “X” should approach this to get the software developed/tested with best quality and within time. [20 Marks] Answer: a) The critical success factors have been spelled out b) In the very beginning of the project spell out the assumptions and constraints c) If number of people and schedule is constrained, plan accordingly to deliver the product with above CTQ’s (Critical To Quality) d) It has been given the team size remains constant. The resource loading pattern in any project is the bell curve. Initially it is minimum, planning phase it increases, execution phase it is maximum, closure phase it again reaches minimum. Since I have more people available I can plan for parallel activities to overcome the shortage in execution phase. e) Plan for quality assurance activities more than the QC activities. f) Spend more resources and time during planning. This will help bringing effectiveness and efficiency in the entire process thereby ensuring optimistic utilization of time with respect to testing and development. g) The success of the project depends on how well you have plan and control the project 10) a. List any 5 Risk associated with software Testing – KD4 10) b. List 5 guidelines to writing the Test Plan – KD 4
Image of page 4

You've reached the end of your free preview.

Want to read all 4 pages?

  • Fall '19
  • Test Manager

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask ( soon) You can ask (will expire )
Answers in as fast as 15 minutes
A+ icon
Ask Expert Tutors