7-5
7-6PassengerArrivesWait for rowcallProperBoardingPassDirected toAppropriateGateOversizeCarry-onCheckLuggagePassengerBoards AircraftYesYesNoNo
7.2Mortgage Service Process Revisited (now CT=60 min. for Title Search)(a)Thebottleneck operation remains “Property Survey” with CT= 90 min. and thus system capacity of (60minutes/hour)(1/90 minutes) = 2/3 applications per hour as before.(b)Rush order flow time follows thenewcritical path, Credit Report, Title Search, and Final Approval for asum of 120 minutes.(c)If the same person performsbothCredit Report and Title Search, then the combined CT= 105 min.Thisperson now becomes the bottleneck and the system capacity is (60 minutes/hour)(1/105 minutes) = 0.57applications per hour.7.3Automobile Driver’s License Office RevisitedQuestionFigureTotal Labor Content(Seconds)Process CT(Seconds)No. WorkersDirect LaborUtilization (%)a9.4a19560654b9.4b19530793c9.519530793(d)Adding one worker and reallocating the tasks has almost doubled the labor utilization.7.4(a)Automobile Driver’s License Office Revisited12345153040203061202401201203090180Bottleneck activity is Activity 4, Conduct Eye TestMaximum capacity is 90 customers/hour7-7Property SurveyCT= 90 min.Credit ReportCT= 45 min.Title SearchCT= 60 min.MortgageApplicationsCompletedApplicationsFinal ApprovalCT= 15 min.NoYes
(b)3061203120302301201,4,575481,4,575481,4,57548The bottleneck is shared by Activities 2, 3, and 6, and has a capacity of 120 customers/hour.This solution will require 3 cameras and 3 eye testing machines, because the first stage has 3 workers inparallel doing identical jobs that consist of 3 activities (1, 4, and 5).7.5(a)Physical Examination1106232033.31846105125NurseNursePhysicianNursePhysicianBottleneck activity is Activity 2, Medical HistoryMaximum capacity is 3 patients/hour(b)3&523&52110622303030302&42&4Improved layout:New capacity is 4 patients/hour7-8
23203&521 & 43.75163&523030Self Service1 & 43.7516Capacity is 4 patients/hour, provided we have a queue of patients, because for this arrangement, Activity2, Medical History, is self-service and, also, only two nurses are required.Best layoutNew capacity is 4 patients/hourNote:For this arrangement, Activity 2, Medical History, can be self-service.7.6(a)School Cafeteria1234510120360306060180209040Bottleneck is Activity 3, Serve entree.Maximum capacity is 60 people/hour.(b)1&290403&43&44545808059040Capacity is increased to 90 people per hour and requires only 4 servers.(c)Make Activity 1, Serve salad and dessert, and Activity 2, Pour drinks, self-serve.7.7(a)Flu Vaccine Shots1203060601234458090407-9
Bottleneck is Activity 4, Administer vaccination.Maximum capacity is 40 people/hour.(b)1234a4b301206060458090409040Bottleneck is Activity 2, Drug allergy consultation.Maximum capacity is 60 people/hour.(c)34a4b458090409040909040401&21&2All activities are perfectly balanced with capacity is 80 people/hour.7.8(a)Ocean World Theme Park RevisitedACBDFE7-10
Upload your study docs or become a
Course Hero member to access this document
Upload your study docs or become a
Course Hero member to access this document
End of preview. Want to read all 24 pages?
Upload your study docs or become a
Course Hero member to access this document
Term
Fall
Professor
N/A
Tags