6. How does the Integrated Master Schedule (IMS) relate to the Integrated Master Plan (IMP)The IMP is a high-level document that identifies the tasks to be accomplished while the IMS break down the task into actionable itemsThe IMS is traceable to the IMP and is time-based extension of the tasks identified in the IMPThe IMS identifies the time frames to be used in the development of the IMPThe IMS provides a more detailed description of the tasks identified in the IMP
7. Consider the differences between the Arrow Diagram Method (ADM) and Precedence Diagramming Method (PDM) network schedules. Which of the following is a true statement?
8. Which of the following is a viable solution to schedule time constraint issues?
9. Consider the differences between a resource-constrained schedule and a time-constrained schedule. Which constraint occurs when there is a shortage of people, equipment, facilities, materials; and which constraint occurs when the length of the critical path surpasses the allottedtime for the project?

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture