QUESTION 18A customer received their three frame Synergy system. However, they are missing a link cable that connects the frame link module between the frames.Which type of cable do they need? A. DACB. MPOC. CAT6AD. AOCCorrect Answer: A Section: (none) Explanation Explanation/Reference: QUESTION 19A customer needs a solution to support Online Transaction Processing (OLTP) and database workloads.Which Gen10 technology would optimize the environment for the customer?
Image of page 10
C Section: (none) Explanation Explanation/Reference: QUESTION 20 DRAG DROP Match each Synergy component with the description of the functionality it provides. Select and Place: Correct Answer:
Image of page 11
Section: (none) Explanation Explanation/Reference: QUESTION 21A customer recently purchased HPE ProLiant Gen10 servers, but finds that their application does not appear to benefit from the newest Xeon processors.Which features should be configured in the BIOS to overcome the issue? A Explanation Explanation/Reference: QUESTION 22A financial customer has a remote office that requires a significant amount of computing resources, but has no local IT staff. They need simple and affordablemanagement and disaster recovery of their site.Which solution should you recommend to meet this customer’s needs? B Section: (none) Explanation Explanation/Reference:
Image of page 12
QUESTION 23A customer is installing multiple racks of DL380 Gen10 servers in a datacenter. They need to configure each one with identical BIOS settings.Which tools are available to solve the situation? (Choose two.) A.HPE Active Health SystemB.HPE Smart Update ManagerC.HPE OneViewD.HPE ICspE.HPE Intelligent ProvisioningCorrect Answer: DESection: (none) Explanation Explanation/Reference: QUESTION 24Your customer has completed a successful Synergy Proof of Concept (PoC) consisting of a single frame with dual composers and dual Virtual Connect SE 40GbF8 modules.The customer wants to:add a second frame before they move into productionhave unified managementhave a separate logical enclosure for each frameWhat are the basic steps to add the second frame? (Choose three.) Section: (none)
Image of page 13
Explanation Explanation/Reference:
Image of page 14
Image of page 15

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture