Dikes run perpendicular to the river while revetments

Info icon This preview shows pages 20–22. Sign up to view the full content.

View Full Document Right Arrow Icon
the river channel alignment by stabilizing or protecting the channel bank line from erosion and caving. Dikes run perpendicular to the river while revetments run parallel. Currently, there are 1,314 existing river training structures and 295 revetments on the MKARNS. Under the 11 or 12-foot component there would be a 7% increase in the number of new river training structures and a 0.3% increase in the number of new revetments along the MKARNS. xx
Image of page 20

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
The number of new river training structures and revetments for the 10, 11, or 12-foot channel will be the same for each depth, although the size of the structures changes. The number of new and modified river training structures and revetments are as follows: 1-Mouth to Pine Bluff 4 new weirs and 21 modified dikes 2-Pine Bluff to Little Rock 30 new and 4 modified dikes 3-Little Rock to Dardanelle 5 and 34 modified dikes 4-Dardanelle to Fort Smith 6 and 28 modified dikes 5-Ft Smith to Muskogee 44 new and 0 modified dikes 6-Muskogee to Catoosa 0 new or modified dikes Total MKARNS 4 new weirs and 85 new and 87 modified dikes 1-Mouth to Pine Bluff 0 new and 9 modified revetments 2-Pine Bluff to Little Rock 1 new and 0 modified revetments 3-Little Rock to Dardanelle 0 new and 1 modified revetment 4-Dardanelle to Fort Smith 0 new and 6 modified revetments 5-Ft Smith to Muskogee 0 new or modified revetments 6-Muskogee to Catoosa 0 new or modified revetments Total MKARNS 1 new and 16 modified revetments To assess the impacts of deeper draft barges on the existing locks, a prototype test at Lock 2 was conducted by the Corps’ Engineering Research and Development Center (ERDC). This testing at Lock 2 led to the following findings: for barges that draft 11.5´ (the maximum draft on a 12-foot channel depth is 11.5 feet): (1) There will be a negligible chance of the barges striking the downstream lock sill when the minimum expected tailwater depth of 14´ occurs at the MKARNS projects. A minimum 14-foot depth over the lock sills is maintained at all times and is not affected by changes under consideration by this study. (2) It is highly unlikely that the barges will strike the downstream lock sill at Lock #2 due to surging in the canal (surging does not occur at locks outside the Arkansas Post Canal). (3) Some operational changes at Lock #2 will be required in order to reduce the chance of a barge striking the upstream miter gate. (4) With operational changes to slow the movement of heavier barges in and around the locks, the risk of increased damage from barge strikes is minimal. However additional analysis will be performed during the Pre-construction Engineering and Design (PED) phase (5) The current filling and emptying operations will be satisfactory for all the side port system locks, except the Ozark and Webbers Falls projects due to the greater lifts of 34´ and 30´, respectively. It is not anticipated that this will affect the potential for 11.5-foot draft traffic although further modeling will be required. ERDC recommends using the numerical models HAWSER and LOCKSIM to determine the impacts to hawser forces and lock filling and emptying times for these projects.
Image of page 21
Image of page 22
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern