The work processes were performed within industry realistic time constraints

The work processes were performed within industry

This preview shows page 57 out of 57 pages.

The work processes were performed within industry realistic time constraints RESULT OF ASSESSMENT Observation Instance 1 Satisfactory Not Yet Satisfactory Observation Instance 2 Satisfactory Not Yet Satisfactory Observation Instance 3 Satisfactory Not Yet Satisfactory Observation Instance 4 Satisfactory Not Yet Satisfactory Observation Instance 5 Satisfactory Not Yet Satisfactory Observation Instance 6 Satisfactory Not Yet Satisfactory Feedback to Student: Assessor(s) Signature(s): Date: / / Student Signature Date: / / New York College Pty Ltd trading as New York College V1.0 December 2018 ACN 610 034 985 ABN 70 610 034 985 TOID 41532 CRICOS 03502J Website: Phone: + 61 07 3848 4354 1009 Ipswich Road, Moorooka, QLD 4105
Image of page 57

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture