out of 25 points In designing a production layout a flexible

Out of 25 points in designing a production layout a

This preview shows page 28 - 32 out of 61 pages.

Question 152.5 out of 2.5 pointsIn designing a production layout a flexible line layout might have the shape of a "U". Question 16 2.5 out of 2.5 points
Image of page 28
In designing a production line mixed-model line balancing might be used by JIT manufacturers. Question 172.5 out of 2.5 pointsLittle's law states that supply chain processes can be regarded as unrelated and thus treated and analyzed separately. Question 182.5 out of 2.5 pointsOne methodology used to evaluate equipment investment decisions where the investment entails an initial investment, fixed costs, and variable costs is Break-Even Analysis. Question 192.5 out of 2.5 pointsOne of the advantages of a functional project organizational structure is that a team member can work on several projects. Question 202.5 out of 2.5 pointsOne trade-off illustrated by the product-process matrix is between flexibility and cost. Question 21 2.5 out of 2.5 points
Image of page 29
PERT is an abbreviation for which of the following methodologies? Question 222.5 out of 2.5 pointsProcess selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces. Question 232.5 out of 2.5 pointsProcess selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service. Question 242.5 out of 2.5 pointsProject management can be defined as planning, directing, and controlling resources to meet the technical, cost, and time constraints of the project. Question 252.5 out of 2.5 pointsSlack activity time is the difference between the early start and the late finish of a project activity time. Question 26 2.5 out of 2.5 points
Image of page 30
Some of the advantages of a functional project where the project is housed in a functional division include which of the following? Question 272.5 out of 2.5 pointsThe critical path in a CPM analysis is found by locating the activities times with zero slack. Question 282.5 out of 2.5 pointsThe efficiency of an assembly-line is found by a ratio of the sum of all task times divided by the cycle time.
Image of page 31
Image of page 32

You've reached the end of your free preview.

Want to read all 61 pages?

  • Fall '14
  • Bateh
  • Cycle Time

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture