QUESTION:148In a 3953 Library Manager, how are scratch tapes kept separate for several differenthosts?
Get answer to your question and much more
QUESTION:149A customer currently has an IBM System z server running DFSMS/MVS and threeSTK silos installed. There are also a total of 24 Timberline drives and 150 unusedslots. There is not enough floor space for another silo. The customer is planning toadd a new IBM DS8000. The IBM DS8000 must be backed up to tape everyweekend using full volume dumps. In three months, the customer plans toconsolidate a tape workload from another site, which will require an additional 16IBM 3490E drives. Which of the following solutions is the best long-term solutionto handle both the existing and new workloads?