Question CorrectDuring the create WBS process for the financial reporting improvement process, the teamcould create all the following breakdown structures as planning evolves except? 6 1.00 points out of 1.00 Question 7 Correct 1.00 points out of 1.00 Select one:a. Resource breakdown structureb. Communication breakdown structure c. Bill of materialsd. Risk breakdown structureThe communication breakdown structure is a distracter in that it does not exist. The bill ofmaterials lists all the components, assemblies, and sub-assemblies. The risk breakdownstructure decomposes the risks on a project. The resource breakdown structure shows thetype of resources utilized on a project. [Crosswind Manual 5.4.5; PMBOK® Guide 9.1.2.2]Select one:a. Create WBS and define activities b. Define activities and control schedulec. Define scope and create WBSd. Create WBS and control scopeThe work of the project is decomposed in the Create WBS process to establish workpackages and in the Define Activities process (Schedule knowledge area) to create activitylists. No other process involves the systematic break down of work elements. [CrosswindManual 5.4; PMBOK® Guide 5.4]The correct answer is: Create WBS and define activities The correct answer is: Communication breakdown structure During what processes is work decomposition performed?
Image of page 4
/ Question 8 Correct 1.00 points out of 1.00 Question Correct 9 1.00 points out of 1.00 Of the following breakdown structures and descriptions, which is correct?
Image of page 5
Image of page 6

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture