Integrate Warfighter Requirements Support Form the Product Support Management

Integrate warfighter requirements support form the

This preview shows page 5 - 7 out of 7 pages.

Integrate Warfighter Requirements & Support
Background image
Form the Product Support Management IPTEstablish/Refine Product Support ArrangementsIdentify/Refine Performance Outcomes 17.) At which point in the life cycle does the Life Cycle Sustainment Plan (LCSP)focus on developing the execution plan for the design, acquisition, fielding, andcompetition of sustainment activities to deliver the Product Support Package? 18.) What is the preferred method of controlling environmentally hazardous materials during manufacturing, operations, and disposal? 19.) System-specific Validated Online Lifecycle Threat (VOLT) reports are required to be kept current and validated throughout the acquisition process. All Major Defense Acquisition Programs (MDAPs) must have a validated VOLT in place at: Milestone A (TMRR Phase)
Background image
Milestone B (EMD Phase) FRP (P&D Phase) IOC (O&S Phase) 20.) As part of the Program Protection Plan (PPP), cybersecurity is a critical priority for DoD. Effective cybersecurity in DoD acquisition programs encompasses all of the necessary actions taken to ensure the _________________ of a system's information to enable warfighting operations.
Background image

You've reached the end of your free preview.

Want to read all 7 pages?

  • Fall '16
  • Management, Integrated Product, operational test, product support, EMD Phase

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture