Interval can also be used by system operators to

This preview shows page 29 - 30 out of 30 pages.

interval, can also be used by system operators to obtain response to contingency events. Spinning reserve is the fastest-responding contingency reserve and thus the most critical for maintaining power system reliability. V. TECHNICAL ASPECT CONSIDERATION A. SITE LOCATION OF PLANT
Image of page 29

Subscribe to view the full document.

B. PLANT LAYOUT C. EQUIPMENT LAYOUT D. ELECTRICAL STUDY E. DESIGN CONCEPT F. MAJOR EQUIPMENT G. TRANSMISSION LINE DATA AND SPECS H. PROTECTIVE DEVICE AND SPECS I. MONITORING SYSTEM VI. PROGRAM OF IMPLEMENTATION A. ELECTRICAL WORKS E. CIVIL WORKS F. MECHANICAL WORKS VII. ENVIRONMENTAL CONSIDERATION VIII. POWER PLANT ORGANIZATIONAL CHART IX. ECONOMIC ASPECT X. RECOMMENDATIONS XI. REFERENCES XII. INDEXES
Image of page 30
  • Spring '18
  • Coal, Electricity generation, Power station technology

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern