Course Hero Logo

1existing status of the proposed road leading to the

Course Hero uses AI to attempt to automatically extract content from documents to surface to you and others so you can study better, e.g., in search results, to enrich docs, and more. This preview shows page 2 - 4 out of 7 pages.

1.Existing status of the proposed road leading to the bridge site: (Please Mark)____ trail ;_____ earth/dirtroad ;_______ potholes present ;_____ canal w/in the roadway_____ existing canal silted ;____ loose surface materials ;_______ some sections are cemented2.Estimated width of the water body for which the structurewill be constructed: ______ (Ln.m)3.Type of water body for which the proposed structure will be constructed:___ River ;____ creek4.From the strongest typhoon that hit the area, what was the maximum flood level? _____m.5.Existing type of soil at the area: _____ Clay;_____ sandy;______ Rocky6.Is there any existing bridge or similar structures within the area / locality? ____ yes____ no7.Quarrying within the area ( 200 meters radius from the proposed bridge site) ____ yes _____ no8.Any potential environmental disaster risks noted on the proposed site: ____________________________________________________________________________________________________________________9.Other barangay that would benefit the proposed structures : ______________________________10. Availableindigenous materials at the area that can be used for the proposed structures:List of materials;______________________________________________________________________________________11.Availability of filling/embankmentmaterials at the area: (distance)____ within the proposed area ;______ 5-10 kms from the area ;_____ more than 10 kms12.Availability of sand and gravel at the area: (distance) ___within the proposed area; ___5-10 kms from the area; ______ more than 10 kms13.Availability of culverts, cement and other construction materials in the area: (distance) ____within theproposed area;______ 5-10 kms from the area;______ more than 10 kms14.Availability of heavy equipment at the area/locality: ____ yes____ no_____ LGU owned; ______ privately owned (contractors)15.Existing means of transportation servicing the community:___ none;___ motorcycle/tricycle;___ jeep;___ 6-wheelers truck ;__ other (Specify)16.Existing cost of fare from the area to the municipal proper:______ per person ; _______ per sack of farm product17.Existing farm products within the influence area : (ex. Palay, Vegetable) _____________________________18.Availability of labor force at the area: ___ skilled ( identify) ________ ;____ unskilled19.Current cost of labor at the area: skilled: _______ /day;unskilled: ________ / dayOther observations: ___________________________________________________________________________Recommendation:This will be filled by technical staff of the validating team (Service Provider, RIE, DAC, or M.E.)On this section, range of options for technical design must be presented to the community.Appropriatetechnology will be finalized and confirmed once the information are analyze.Attach Photos of the proposed site.
SITE VALIDATION REPORT(For Buildings)Date of Field visit: ____________________Brgy. _______________Mun: _________________Name of proposed sub-project: ______________________________________________________________Location: Station Limits (Sitio) : ___ ___________________________________________________________Name of contact person (PPT/BRT member) ____________________________________________________No. of present population of the target area:________;Male: ______Female: _______Total No. of Households: _______ Ave. No./HH: _______(For joint barangay proposal, total for theparticipating barangays)1.Existing status of the road leading to the proposed site: (Please Mark)___ trail ;____ all weather gravel road;____ gravel road w/some cemented portion2.Distance of the area from the municipal proper : _______ (kilometers)3.Means of transportation from the Poblacion to the proposed site:___ none;___ motorcycle/tricycle;___ jeep;___ banca ;___ others (specify)_______4.Ownership of the property for which the building will be constructed:N_
5.Terrain of the proposed sub-project site:

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 7 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Summer
Professor
N/A
Tags
Road, Water supply network, Purok, Barangay, Sitio

Newly uploaded documents

Show More

Newly uploaded documents

Show More

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture