A_E_Specification_enUS_2664119691.doc

Items to be included under this heading depend upon

Info icon This preview shows pages 3–5. Sign up to view the full content.

View Full Document Right Arrow Icon
RELATED WORK IN CONTRACT SHALL BE INSERTED HERE. ITEMS TO BE INCLUDED UNDER THIS HEADING DEPEND UPON HOW A SPECIFIC PROJECT IS SCOPED AND PREFERENCES OF A PARTICULAR OWNER. THE FOLLOWING ARE USUALLY INCLUDED: 1. POWER 2. RACEWAYS 3. TELEPHONE LINES (ONLY FOR OFF-SITE REPORTING) 4. NETWORK FACILITIES 1.2 GENERAL CONDITIONS 1.2.1 Submittals at Bid Time For bid evaluation, bid submittals shall include six (6) sets of the items described below: A. Specification sheets (cut-sheets) of all proposed equipment B. Equipment list identifying 1. Model number of each unit 2. Quantities of each type of device 3. Unit costs C. Specification compliance: A letter submitted with the bid responding to specification sub- sections individually, indicating exceptions, substitutions, and alternates 1.2.2 Submittals after award of contract Drawings: Shop drawings to provide details of proposed system architecture and the work to be provided. These include point-to-point drawings of systems and individual device wiring diagrams. 1.2.3 Documentation to be submitted by the Contractor upon completion of system installation “As-built” Upon completion of installation, the Contractor shall prepare “as-built” drawings of the system. These “as-built” shall be 76.2 mm x 107 mm (30 in. x 42 in.) format Mylar reproducible drawings of Conettix IP A&E Specifications 45998C Page 3 © 2005 Bosch Security Systems
Image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Conettix IP Architectural & Engineering Specifications each floor plan indicating exact device locations, panel terminations, cable routes and wire numbers as tagged and color coded on the cable tag. Additionally, final point-to-point wiring diagrams of each type of device (on 76.2 mm x 107 mm (30 in. x 42 in.) format) shall be included in the “as-built.” “As-built” shall be submitted to the Owner for approval prior to the system acceptance walk- through. Operation and maintenance manuals: Three (3) sets of operating manuals shall be provided explaining the operation and maintenance of the system. 1.2.4 Training On-site security personnel training: The Contractor, upon completion of installation, shall furnish training in the complete operation of all systems. REPLACE THIS PARAGRAPH WITH APPROPRIATE CRITERIA FOR YOUR CONTRACT THE EXTENT OF THE TRAINING PROCESS AND THE TIME NEEDED TO CARRY OUT THE TRAINING ARE DEPENDENT ON THE SIZE AND COMPLEXITY OF THE SYSTEM. SPECIFIER TO INSERT NUMBER HERE Factory training for security administrators The training program shall also include training at the factory for the System Administrator. The system administrator shall be sponsored by the contractor to attend a complete training program offered by the system manufacturer. 1.2.5 System Approvals A. The system shall be the standard product of one manufacturer, and the manufacturer shall have been in business manufacturing similar products for at least 5 years with existing installations for a minimum of the same time period.
Image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern