Acquisition of appropriate permission from the respective authorities

Acquisition of appropriate permission from the

This preview shows page 6 - 10 out of 20 pages.

Acquisition of appropriate permission from the respective authorities Acquisition of raw construction materials and utilities for the construction progress Outputs Documents that have preview of the hired workers’ daily workload. Procurement documents of the construction project. A document that records in the budget baseline for the construction project. The individual’s project goals for the construction project. Compaction tests of the end products; highway and railway bridge. Bitumen tests of the end products; highway and railway bridge Project team training, competence & continuity(M)
Image of page 6

Subscribe to view the full document.

1. Detect incompetency and source of low employee morale Determine the individual or group that is incompetent and pinpoint the reason behind it by conducting surveys to solve the issue and increase competence. One of the biggest underlying reason is stress. 2. Implementation of easy tools and strategies of team building Execute buddy system, establish committees and societies at the workplace. Friendships in the workplace retain employees. 3. Open meeting with higher officers Once a month a friendly meeting between higher officials and representatives in the lower working class. Improve and establishes a communicative plan between workers. 4. Create an incentive program Provide a bonus or an increment to employees showing initiative and improvement with the aim to praise good behavior and to remind them that they are appreciated. 5. Create fun outing Go for a hiking trip or a theme park to spark friendships beyond the workplace to motivate them to stay and to reduce stress in the long run. Roles and responsibilities(M) 1. Construction manager Overseeing, directing and communicating all onsite and offsite constructions with the compliance with building and safety regulations from the start of the project till the end 2. Estimator To analyze and estimate the amount of funds required throughout the project, allocate the funds accordingly and to ensure the continuity of the project. 3. Architect
Image of page 7
Communicate with the client and put his idea into a feasible plan and practical plan to convey to the construction crew. 4. Electrician Installation and ensuring the functionality of connections of all the electrical components within the project. Temporary Works(N) This will include the setting up of a site compound, building of the haul roads in order for the equipment to reach the working destination and the fencing. Earthworks(N) This includes excavation, topsoil strip and topsoil place, in accordance with the construction plan the topsoil strip consists 200mm, after which excavation will take place. Once excavation is concluded top soiling of 150mm will take place. Roadworks(N) The building of the highway and the footpath will be done under this process. The building of the road will be broken down into 5 parts as the road consists of 5 different layers, namely: 1. Surface course 2. Binder course 3. Base course 4. Granular sub-base 5. Capping layer Whereas the footpath will be broken down into 3 parts as it consists of three layers, namely:
Image of page 8

Subscribe to view the full document.

1. Surface course 2. Binder course 3. Granular sub-base
Image of page 9
Image of page 10
  • Spring '17
  • Xavier

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Ask Expert Tutors You can ask 0 bonus questions You can ask 0 questions (0 expire soon) You can ask 0 questions (will expire )
Answers in as fast as 15 minutes