WORK BREAKDOWN STRUCTURE 4 Coffered ceiling i Stain all wood and interior

Work breakdown structure 4 coffered ceiling i stain

This preview shows page 4 - 5 out of 5 pages.

WORK BREAKDOWN STRUCTURE 4 Coffered ceiling i. Stain all wood and interior molding ii. Determine the layout of ceiling grid iii. Measure the dimensions of grid and cut to appropriate size iv. Neil it to the ceiling v. Measure the size of Interior crown and fasten 5. Second floor construction Girder truss i. Designing of truss ii. Saw every member of truss into perfect shape and size iii. Arrange trusses and secure the joints Pre-engineered trusses (Process is similar to that of girder truss) Stone face masonry for furniture 6. Roof (slopped) Mount trusses Install temporary bracings Install end trusses Install standard trusses Sheaf the roof Install the underlayment Install the roof cover 7. Elevation Masonry veneer exterior wall
Image of page 4
WORK BREAKDOWN STRUCTURE 5 i. Preparing the surface ii. Raising a veneer from outer edge toward inner edges iii. Levelling a veneer iv. Anchoring the veneer using wall ties or anchors v. Finishing the veneer
Image of page 5

You've reached the end of your free preview.

Want to read all 5 pages?

  • Winter '19
  • Structural system, Wood frame house

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture