9.The manufacturing process used to make a wide variety of highly customized products in quantities as small as one is a: A.Assembly line. B.Continuous process. C.Job shop.
Background image
D.Fixed position. E.Work center 10.Which of the following basic types of process structures is one in which similar equipment or functions are grouped together?
Background image
MGT 314 Operations & Supply ManagementReview Questions Chapter 8 1.Which of the following is not considered an input to the layout decision in facility layout analysis? 2.Which of the following is a basic type of production layout format? 3.Which of the following basic types of production layout formats is one in which equipment or work processes are arranged according to the progressive steps by which the product is made? A.Job-shop layout B.Functional layout C.Assembly line layout D.Group technology layout E.Process layout 4.Which of the following basic types of production layout formats is one that has similar equipment or functions are grouped together? 5. Using the assembly-line balancing procedure, which of the following is the takt time in minutes per unit if the daily production time is 480 minutes and the required daily output is 50 units?
Background image
6.Using the assembly-line balancing procedure, which of the following is the takt time if the production time in minutes per day is 1,440 and the required output per day in units is 2000? 7.Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4, 6, 7, 2, 6, and 5 minutes, and the takt time is 10 minutes? A.3 B.5 C.6 D.8 E.None of these 8.Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the eight tasks that make up the job are 7, 4, 7, 8, 9, 4, 3, and 6 minutes, and the takt time is 8 minutes?
Background image
Image of page 31

You've reached the end of your free preview.

Want to read all 33 pages?

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture