True False 21 When are all seven Integrated Program Management Report IPMR

True false 21 when are all seven integrated program

This preview shows page 5 - 8 out of 12 pages.

with the established military standard through formal third party certification. True False 21) When are all seven Integrated Program Management Report (IPMR) formats required? Cost and incentive contracts of $50 million or more 22) Which of the following exceptions to the full funding policy would allow the Government to budget for buying three years’ worth of engines under one contract in order to save money? Multiyear Procurement
Background image
23) The operational effectiveness and operational suitability questions that must be addressed during Operational Test and Evaluation (OT&E) to assess the system's capability to perform its mission are called ___________. Measures of Performance (MOP) 24) Sources of risk include: Schedule 25) To ensure interoperability, compliance with the DoD IT Standards Registry (DISR) is required for all command, control, communications, computers, and intelligence (C4I) systems and automated information systems acquired within DoD. TrueFalse 26) Joint Interoperability Test Command (JITC) has primary responsibility for developmental test and evaluation (T&E) functions throughout DoD. SEE LESSON 2.5 True False 27) Regarding test and evaluation (T&E) issues that may affect a program’s acquisition strategy, the program office can use ______________ to aid in understanding the implications of any necessary tradeoffs among testing constraints. Design of Experiments (DOE)Modeling and Simulation Simulation-Based Acquisitions Early Operational Assessments
Background image
28) An example of participation in market research by the technical Integrated Product Team (IPT) members would be their evaluation of existing commercial products and non-developmental items (NDI). True False 29) Financial managers use escalation to consider the effects of inflation on an acquisition program by applying: SEE ELSSON 2.7 Inflation factors to actual costs incurred by the contractorFull funding policy to defense procurement appropriations requested in the budget Compound and composite indices to program cost estimates Incremental funding policy to Research, Development, Test, and Evaluation (RDT&E) appropriations requested in the Program Objectives Memorandum (POM) 30) What is the preferred method of controlling environmentally hazardous materials during manufacturing, operations, and disposal? Treatment of hazardous wastes is preferred over recycling because of lower manufacturing costs. Disposal is the preferred method because of new technologies and improved landfill processes. Source reduction or elimination is the most highly preferred control strategy.
Background image
Image of page 8

You've reached the end of your free preview.

Want to read all 12 pages?

  • Fall '16
  • Project Management, Software development process, Acquisition Program Baseline, operational test

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture