CAPEX -10% module Nominal CAPEX CAPEX +10% module CAPEX +20% module 10.24% R$ 3.34/Wp R$ 3.55/Wp R$ 3.75/Wp R$ 3.95/Wp R$ 4.15/Wp Investment R$ 355.1 Millions R$ 376.7 Millions R$ 398.2 Millions R$ 419.7 Millions R$ 441.2 Millions R$ 170/MWh 5.21% 3.52% 1.92% 0.39% -1.09% R$ 180/MWh 6.91% 5.21% 3.61% 2.10% 0.65% R$ 190/MWh 8.54% 6.81% 5.21% 3.70% 2.26% R$ 200/MWh 10.12% 8.35% 6.73% 5.20% 3.77% R$ 210/MWh 11.64% 9.84% 8.18% 6.65% 5.20% R$ 220/MWh 13.14% 11.29% 9.60% 8.03% 6.57% R$ 230/MWh 14.61% 12.70% 10.97% 9.38% 7.90% R$ 240/MWh 16.06% 14.10% 12.32% 10.69% 9.18% R$ 250/MWh 17.49% 15.47% 13.64% 11.97% 10.43% R$ 260/MWh 18.91% 16.82% 14.94% 13.22% 11.65% R$ 270/MWh 20.32% 18.16% 16.22% 14.46% 12.85% R$ 280/MWh 21.72% 19.50% 17.50% 15.69% 14.03% R$ 290/MWh 23.12% 20.82% 18.76% 16.90% 15.20% R$ 300/MWh 24.52% 22.14% 20.02% 18.10% 16.36% R$ 310/MWh 25.91% 23.46% 21.27% 19.30% 17.51% R$ 320/MWh 27.31% 24.78% 22.52% 20.49% 18.65% R$ 330/MWh 28.70% 26.09% 23.76% 21.67% 19.78% R$ 340/MWh 30.10% 27.40% 25.01% 22.85% 20.91% Case 2 Scenario 2020 Local Modules
Image of page 63
Using the Tables The tables simulate various scenarios for current and future entrepreneurs who wish to structure centralized generation photovoltaic Projects. With the tables it is possible to check the advantages and disadvantages of some strategic enterprises, in addition to simulate the best timing for construction of the power plants. Then we will use an example of power plant simulation to predict the highest bid for an auction, in addition to the strategies that could be adopted to reduce the bid for energy sale. Example: Hypothetical 90 MW Power Plant to bid for LEN A-4 2017. We will consider a power plant identical to the previously presented for construction of scenarios and find out which would be a good bid to energy sale to the enterprise and the possible strategies. 2017 2018 2019 Condition 1 Condition 2 Auction Auction 2020 Power Plant Construction 2021 Regulated Market Operation Power Plant Construction Free Market Regulated Market Operation Energy Prices are illustrative, as it varies according the each project drivers and assumptions
Image of page 64
Using the Tables 2017 2018 2019 2020 Condition 1 Condition 2 Auction Auction 2021 Power Plant Construction Regulated Market Operation Power Plant Construction Free Market Regulated Market Operation For a power plant that will be built in 2020, we have to use the 2020 scenario and stipulate the CAPEX return and scenario to be adopted. A comparison must be done between the two cases in order to see the advantages and disadvantages of local modules funding and purchasing. Case 1 Imported Module and Case 2 Local Module Scenario 2020 Case 1 Imported Module and Case 2 Local Module Scenario 2019
Image of page 65
Using the Tables 2017 2018 2019 2020 Condition 1 Condition 2 Auction Auction 2021 Power Plant Construction Regulated Market Operation Power Plant Construction Free Market Regulated Market Operation Case 1 - Scenario 2020 Imported Module Nominal CAPEX: $3.17/Wp IRR Required: WACC+2% WACC 2020: 12.95% IRR in the Table: >15.21% Case 2 - Scenario 2020 Local Module Nominal CAPEX: $3.75/Wp IRR Required: WACC+2% WACC 2020: 10.24% IRR in the Table: >12.44% Energy Sales Price in 2020: 250 R$/MWh Energy Sales Price in 2020: ~240 R$/MWh Energy Value in 2017 *: 230.58 R$/MWh Energy Value in 2017 *: ~221.36 R$/MWh *The corrected energy value for 2017 - auction date - recede the IPCA of 2019 and 2018. The IPCA of 2020 shall not be considered because the disbursement is made at the beginning of the year and the model already considers the delivery of the corrected energy for 2021.
Image of page 66
Using the Tables 2017 2018 2019 Condition 1 Condition 2 Auction Auction 2020 Power Plant Construction 2021 Regulated Market Operation
Image of page 67
Image of page 68

You've reached the end of your free preview.

Want to read all 75 pages?

  • Fall '19
  • Photovoltaics, Weighted average cost of capital

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes
A+ icon
Ask Expert Tutors