Correct 100 points out of 100 Question 13 Correct 100 points out of 100 The

Correct 100 points out of 100 question 13 correct 100

This preview shows page 7 - 9 out of 17 pages.

Question 12Correct 1.00 points out of 1.00 Question 13Correct 1.00 points out of 1.00 The medical billing system project has entered closure. As the project manager and theteam prepare for closure, they are told that scope validation will be very important to thesuccess of the project. Of the following, which best describes the importance of validatescope? Select one:a. Validate scope should have been done earlier in the project and since it wasn'tdone then, it's important to complete it before the project is completeb. Validate scope is the process of comparing what the project created to the projectscope statement, product description, and anything else that helps ensure that theresults of the project will function as intended c. Validate scope is used to confirm that the project team understands the scope ofthe projectd. Validate scope authenticates that the sponsor signed the project scope statementat the beginning of planningValidate Scope is used to compare the work the project created to that which was plannedto build, and to ensure that the results of the project will function as intended. It caninclude using the project management plan, requirements documentation, and validateddeliverables. If the validation process is satisfactory, the work of the project is typicallyviewed as acceptable. [Crosswind Manual 5.5; PMBOK® Guide 5.5]The correct answer is: Validate scope is the process of comparing what the projectcreated to the project scope statement, product description, and anything else that helpsensure that the results of the project will function as intended The product owner is working with the development team to finalize items in the currentiteration. The product owner has just changed priority on a few items in the backlog. Theapproach being used is most likely? Guide Chapter 5 Intro]
Image of page 7
/ Question 14Correct 1.00 points out of 1.00 Question 15Correct 1.00 points out of 1.00 The project manager is in the process of creating the scope statement. There are anumber of items that can exist both in the requirements and scope statement. Which ofthe following items are most likely to be only in the scope statement?
Image of page 8
Image of page 9

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture