UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 38 CHECK LIST FOR TILING : Project : _______________ Building Name : ______________ Location : _________ 1] Surface is cleaned in advance. 2] Bedding Mortar proportion & thickness as per specification. 3] Required door shutter height is available. 4] Defective tiles removed after checking & tiles are of correct size as required. 5] Level pads for bedding mortar. 6] Marking of level lines on all walls. 7] Soffit of loft in toilet is in level, if not to be corrected as instructed. 8] Toilet floor as per drawing 9] Dado as per drawing to match C.P. Fittings, Window cill. 10] Dado to be in perfect plumb & right angle. 11] Tile joints racking, cleaning & later filling with matching cement & colour and removal of excess material from joints. 12] Cutting done in tiles for electric & plumbing points to be perfect. 13] Cut pieces where required made with machine. 14] Tiling work is matching in colour/design. 15] Skirting to be in plumb and right angle and flush with wall 16] Polishing done with proper stone [in case of Kota / Marble any] 17] Height of skirting & dado as specified 18] Slope provided wherever required especially below kitchens, toilets and washing places Name Signature UNNATTI ENGG. _______________________ ________________________ Client / Consultant Engineer : ______________ ________________________
Image of page 38
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 39 CHECK LIST OF PLUMBING WORKS - PART A : Project : _______________ Building Name : ______________ Location : _________ 1] Drawing verified with site condition . 2] Level of 1s chamber to be checked & verified 3] Slope as per Local Authority rules available at size 4] Materials available are as per standards & specifications. 5] Sizes of man holes as required CHECK LIST FOR PLUMBING WORKS - PART B Down take [Drainage] : 1] All shop drawings available 2] Materials at site as per specifications 3] Holes from toilets are in line as required CHECK LIST OF PLUMBING - PART C : G. I. Looping & Down take : 1] Shop drawings available : a) For Terrace looping b) For Toilets details 2] Material as per specification 3] Wall chasing to be verified for GI/Copper pipe layout inside toilets [concealed] Name Signature UNNATTI ENGG. _______________________ ________________________ Client / Consultant Engineer : ______________ ________________________
Image of page 39

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 40 STEEL RECEIPT STATEMENT [MONTHLY] Date : ________ PROJECT ____________ BUILDING __________ ENGINEER _____________ DEAILS OF ROLLING MARGIN DONE UPTO ______________ DATE QTY AS PER CHALLAN NET QTY RECD. ROLLING MARGIN Previous Qty. upto TOTAL % of Rolling Margin : Wt. of steel considered [a] MARGIN [b] Net effect [c] = [a]+[b] % of Rolling Margin c/a x 100 Total + - STATEMENT OF RECEIPT OF STEEL : Month Weight of Steel Total Previous qty. upto ..... 6 mm 8 mm 10 mm 12mm 16mm 20mm 25 mm TOTAL SUMMARY : Total Steel Recd. upto ___ Effect of Rolling Margin Net Received Consumption Send to other site Scrap Balance + - REMAKRS (if any] : Client / Consultant Engineer UNNATTI Site Engineer
Image of page 40
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 41 MATERIAL TESTING CEMENT I] FIELD TESTS : 1] IDENTIFICATION : Grade, Date of mfr., Co., Factory, weight, Cement should not preferably be older than 30 days.
Image of page 41

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

Image of page 42
This is the end of the preview. Sign up to access the rest of the document.
  • Summer '18
  • Naveen
  • Civil Engineering, ........., Consultant Engineer, UNNATTI, UNNATTI CONSTRUCTIONS PVT

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern