The bid submission date for the contract is Soft Copy and

The bid submission date for the contract is soft copy

This preview shows page 20 - 21 out of 62 pages.

The bid submission date for the contract is January 25, 2016 (Soft Copy) and January 28, 2016 (Hard Copy). The third contract is for the supply of tower package for the 765 kV Bikaner– Moga double-circuit transmission line under the ADB-funded Green Energy Corridor and Grid Strengthening Project with a bid deadline of February 3, 2016 (Soft Copy) and February 5, 2016 (Hard Copy). The fourth contract is for the supply of the optical ground wires (OPGW) package for the 765 kV Warora–Parli double-circuit transmission line; 765 kV Parli–Solapur double-circuit transmission line; 400 kV (Quad Moose) Parli (POWERGRID)–Parli transmission line associated with the Transmission system for the Gadarwara STPS (2x800 MW) of NTPC (Part-B) project under the tariff- based competitive bidding (TCBC) route. The bid due date for the contract was January 13, 2016. The fifth contract is for the supply of the OPGW package for the 765 kV double-circuit line-in-line-out (LILO) point of Seoni–Bina line to Jabalpur pool; 765 kV double-circuit LILO point of Seoni–Bina line at Gadarwara; 765 kV double-circuit LILO Gadarwara– Warora transmission line; 400 kV double-circuit LILO of both circuits of the Wardha–Parli (POWERGRID) line at Warora associated with the Transmission system for the Gadarwara STPS (2x800 MW) of NTPC (Part-A) project. The submission deadline for the contract was January 15, 2016. The last contract is for the extension of the 400 kV substations at Farakka, Berhampur, Subhasgram and Sagardigi, including supply, erection, testing and commissioning of the 400 kV, 1x125 MVAr bus reactor at the Berhampur substation under the Eastern Region Strengthening Scheme–XV (ERSS-XV). The contract is open only for domestic contractors and the bid due date was January 13, 2016 (Soft Copy) and January 15, 2016 (Hard Copy). India’s POWERGRID invites tower package bids for high voltage lines India’s CTU POWERGRID has invited four bids for the supply of tower packages for high voltage lines associated with the Strengthening of Transmission System in Southern Region Beyond Vemagiri. The first contract is for the supply of tower package (including conductor, insulator, hardware fittings and conductor accessories, spacer damper, rigid spacer, earthwire and OPGW) for the 290 km long, 765 kV Vemagiri– Chilakaluripeta double-circuit transmission line. The second contract is for the supply of tower package (including conductor, insulator, hardware fittings and conductor accessories, spacer damper, rigid spacer, earthwire and optical ground wire [OPGW]) for the 275 km long, 765 kV Chilakaluripeta–Cuddapah double-circuit transmission line. The third bid is for supply of tower package (including conductor, insulator, hardware fittings and conductor accessories, spacer damper, rigid spacer, earthwire and optical ground wire [OPGW]) for the 240 km long, 400 kV Cuddapah–Madhugiri double-circuit transmission line.
Image of page 20
Image of page 21

You've reached the end of your free preview.

Want to read all 62 pages?

  • Fall '10
  • BOB
  • Electric power transmission, Electricity distribution, Electricity market, CFE, Federal Energy Regulatory Commission

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes