validation The Verification Plan is written at a detailed technical level, while the TEMP is a high-level plan
3) Methods used for verification of DoD systems include: Analysis, Inspection, Test and: [Describe four methods used for verification.] [Remediation Accessed :N]
4) “Evaluation” is a procedure or process used to obtain data while “Test” is the analysis and assessment of data. [Explain the differences between Test and Evaluation]
5) Modeling and Simulation (M&S) facilities, when used, can be considered as one of the enabling products for the Verification Process. [Describe the role of Modeling and Simulation (M&S) in verification]
6) The Verification Matrix should specify, among other information, the form of the end product used during verification. [Describe how a Verification Matrix is used] True Fals e
7) The most important source of verification deficiencies is caused by over-stressing an End Product by operating it in its intended environment. [Identify sources of verification deficiencies]
1) The use of mathematical modeling to predict compliance of a design to requirements is typically associated most with which of the following verification methods? [Describe four methods used for verification.]
correct