TEM countries Belarus FYROM Greece Republic of Moldova Russian Federation

Tem countries belarus fyrom greece republic of

This preview shows page 6 - 10 out of 18 pages.

TEM countries (Belarus, FYROM, Greece, Republic of Moldova, Russian Federation, Serbia and Montenegro, Slovenia, Ukraine). Thanks to the kind contribution of the International Road Transport Union (IRU) amounting to 100,000 Swiss francs, the elaboration of the TEM Master Plan (broken down into 10 Work Packages) started in September 2003 and its termination is planned for the end of October 2004. Till now, the TEM Project Manager and his Deputy have taken part in three meetings (Budapest, Warsaw, Geneva) of the Coordination Group for the TEM and TER Master Plans chaired by the UNECE. Moreover, the first Meeting of the Experts Group for the TEM Master Plan was organized in Bratislava, Slovakia on 9 February 2004. Preliminary information and recommendations regarding the TEM Master Plan can be found on the UNECE website: 32. In the reporting period, collaboration with the TER Project Central Office in Budapest, established in 1991, continued. The collaboration concentrated mostly on the administration of both Projects, on the possibilities of cooperation with the European Commission in activities having multimodal scope and on the coordination of all matters concerning the elaboration of the TEM and TER Master Plans.
Image of page 6
TRANS/SC.1/2004/4 page 7 * * *
Image of page 7
T R A N S / S C . 1 / 2 0 0 4 / 4 p a g e 1 4 A n n e x 2 Annex 1 STATUS OF TEM NETWORK (as of 1.01.2004) COUNTRY Total length PROGRAMMED (in study, preliminary design and design phases) UNDER CONSTRUCTION IN OPERATION COMPARATIVE INDICATORS km one carriageway Both carriageways one carriageway both carriageways one carriageway both carriageways % of total TEM length CONSTRUC TION PROGRESS (% of length under construction) DEGREE OF COMPLETI ON (% of length in operation) Column No. 1 2 3 4 5 6 7 8 9 10 AUSTRIA 485 19 36 16 - 35 414 2.1 1.6 89.0 BOSNIA and HERZEGOVINA 331 - 319 - - - 12 1.4 - 3.6 BULGARIA 925 - 617 - 15 19 274 3.9 1.6 30.7 CROATIA 1465 311 564 36 257 101 420 6.3 18.8 32.1 CZECH REPUBLIC 987 - 414 8 30 8 535 4.2 3.4 54.6 GEORGIA 1053 - 1045 - - - 8 4.5 - 0.8 HUNGARY 1658 653 377 20 52 34 522 7.1 3.7 32.5 ITALY 1519 - - - 4 - 1515 6.5 0.3 99.7 LITHUANIA 731 204 12 - - 254 466 3.1 - 81.1 POLAND 3383 425 2247 - 83 86 542 14.4 2.5 17.3 ROMANIA 2983 - 2735 - 134 - 114 12.8 4.5 3.8 SLOVAKIA 948 - 487 23 77 588 348 4.1 9.5 68.6 TURKEY 6921 - 378 - 321 3954 2268 29.6 4.6 61.3 TOTAL 23389 1612 9231 103 973 5079 7438 100.00 4.4 42.7
Image of page 8
T R A N S / S C . 1 / 2 0 0 4 / 4 p a g e 1 4 A n n e x 2 Annex 2 TRANS-EUROPEAN NORTH-SOUTH MOTORWAY (TEM) PROJECT PROGRAMME OF WORK FOR THE YEAR 2004 Objective Activity Action Implemented by 2004 No. Description No. Priority Description I II III IV 1. Updating of TEM network, acceleration of its construction and review of TEM priorities 1.1. I. Elaboration of the TEM Master Plan aiming at covering the identified priority needs 1.1.1. Attaining maximum compatibility between TEM network, Pan- European Transport Corridors and TINA network PCO Governments * * * 1.1.2. Preparation of updated maps of TEM network and traffic, alignments and dynamism towards neighbouring regions, incorporating intermodality and truck and coach traffic PCO * * * 1.1.3.
Image of page 9
Image of page 10

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture