Equipment.JSub - Totalfor BC.Total(A+B)D. Outputper Hour=Outputfor theseitems are consideredin the installationof pipesE.DirectUnit Cost (C+D)NameandSpecificationUnitQuantityUnitCostAmount(PhP)F.Materialsa. B.l. 90 elbow/B.l.Tee/Bell ReducerlBlindPrices of materials are variable per Region!Flange/Slip Flange/Riser Nipple/Threadolet!Pipe1.00District based on the prevailing unit prices inpcthe locality which include payment of localSleevetaxes and hauling cost to the project site.b. Consumables(5% of materialcost)Refer to the Construction Material Price Dataestablished quarterly by Central Office PriceMonitoring Committee.Sub - Totalfor FG.DirectUnit Cost (E+F)H. Overhead,Contingencies& Miscellaneous(OCM)Expenses15%/12%/10%/8%of GI.Contractor'sProfit (CP)10%/8%of GJ.ValueAddedTax (VAT)5% of (G+H+I)K.TotalUnit Cost(G+H+I+J)Note1. Use this cost sheetfor Item Nos. 1202(4)b,1202(4)c,1202(5)a,1202(5)b,1202(6)a,1202(6)b,1202(7)a,1202(8)aand1202(9)a.268Part E - Mechanical
Background image
Item No./DescriptionUnit of MeasurementOutputDETAILEDUNIT PRICE ANALYSIS(DUPA) 1202(10)Fire Hose Valve siames 150 mm 11lx 2 w x 65 mm 11lwith capset1 setDesignationNo. of Person/sNo. of HourIsHourly RateAmount (PhP) A. Labora. Construction Foreman13.00Labor Rates are variable per Region/Districtb. Skilled Laborer13.00based on minimum wageasapproved byc. Unskilled Laborer23.00DOLE. Refer to the ScheduleofLabor Rates.B.EquipmentC.Total (A+B)D. Output=1 setE. Direct Unit Cost (C+D)Name and SpecificationUnitQuantityUnit CostAmount(PhP)F. MaterialsSub - Total for AName and CapacityNo. of Unit/sNo. of HourIsHourly RateAmount (PhP).JSub - Total for Ba. Fire Hose Valve siames 150 mm0x 2 w x 65Pricesofmaterials are variable per Region/set1.00District based on the prevailing unit prices inmm0with capthe locality which include paymentoflocalb. Consumables (5% of Materials Cost)taxes and hauling cost to the project site.Refer to the Construction Material Price Dataestablished quarterly by Central Office PriceMonitoring Committee.Sub - Total for FG.Direct Unit Cost (E+F)H. Overhead, Contingencies & Miscellaneous (OCM) Expenses15%/12%/10%/8%of GI.Contractor's Profit (CP)10%/8%of GJ.Value Added Tax (VAT)5% of (G+H+I)K.Total Unit Cost(G+H+I+J)269Part E - Mechanical
Background image
Item No.lDescriptionUnit of MeasurementOutputDETAILEDUNIT PRICE ANALYSIS(DUPA)
Background image
Image of page 280

You've reached the end of your free preview.

Want to read all 288 pages?

  • Fall '18
  • Prof Robles
  • unit cost, unit price analysis, ordinary soil condition

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture